We research and approve all production area plans, bodyshell models, and production drawings that later will be submitted to the general contractor and also provide fully approved drawings for further implementation.
Conduct visits to the facility, followed by two reports (the first visit after installation of the ventilation system and cooling chamber, the second after connecting 50% of the equipment).
One visit is performed after 100% equipment installation and another visit is to confirm troubleshooting.
If necessary, we provide additional consultation on technical and design issues related to the construction of facilities.